Preliminary bill of material
After the design stage, we need to consider the cost of different parts. It is essential for us to build up a BOM file. In the BOM file, we would list out the cost of all the parts such as mechanical, electrical and pneumatic parts. Also, BOM file brings the benefits for us to know cost clearly.
In our machine, most of the parts are coming from SMC company. We need to produce a BOM file for SMC company so that they can make a quotation. That quotation lists out all the cost in different parts. In this project, we have the whole design of the machine, but we need to do the simulation. We should make sure the design is feasible in Mingji Company, so we need to complete the simulation of our production. We chose some parts that only using in our production and we produce the BOM file about that.
On the above BOM file, we should state the name of the product and the description so that SMC company can find out the cost of different parts. SMC would send the quotation for us to let us know the cost. To considering the quantity of different parts, we can calculate the overall cost of our simulation production. During the considering the cost, some of the parts are coming from TaoBao website because there are more cheaper than other shops. That BOM file will also send to our client MingJi Company.
In our machine, most of the parts are coming from SMC company. We need to produce a BOM file for SMC company so that they can make a quotation. That quotation lists out all the cost in different parts. In this project, we have the whole design of the machine, but we need to do the simulation. We should make sure the design is feasible in Mingji Company, so we need to complete the simulation of our production. We chose some parts that only using in our production and we produce the BOM file about that.
On the above BOM file, we should state the name of the product and the description so that SMC company can find out the cost of different parts. SMC would send the quotation for us to let us know the cost. To considering the quantity of different parts, we can calculate the overall cost of our simulation production. During the considering the cost, some of the parts are coming from TaoBao website because there are more cheaper than other shops. That BOM file will also send to our client MingJi Company.